8–12 Jun 2026
ALBA Synchrotron
Europe/Madrid timezone

Session

Facility Status Reports

8 Jun 2026, 09:45
Maxwell Auditorium (ALBA Synchrotron)

Maxwell Auditorium

ALBA Synchrotron

Carrer de la Llum 2-26 08290 Cerdanyola del Vallès, Barcelona, Spain

Presentation materials

There are no materials yet.

  1. Samuel Twum (SKAO)
    08/06/2026, 09:45
    Facility Status Reports
    Talk

    Construction activities across the SKA Observatory are accelerating as we work toward key delivery milestones. In my previous update, I shared the first image produced by the SKA-Low telescope in Australia. Since then, significant progress has been made toward achieving a comparable milestone for the SKA-Mid telescope. Most notably, SKA-Mid has successfully demonstrated fringes and phase...

    Go to contribution page
  2. yves-marie abiven (synchrotron SOLEIL)
    08/06/2026, 10:05
    Facility Status Reports
    Talk

    Since its commissioning in 2008, SOLEIL [1] has provided users with access to a broad portfolio of experimental techniques across 29 beamlines, spanning an energy range from infrared to hard X-rays. To meet the evolving needs of the scientific community and society at large, SOLEIL is now engaged in a major upgrade — the SOLEIL II project [2] — which formally entered its construction phase in...

    Go to contribution page
  3. Alexander Kessler (HI-Jena)
    08/06/2026, 10:25
    Facility Status Reports
    Talk

    Short overview about Tango and Sardana activities at HI-Jena during last year including:

    • HIJ-pyVision as tailored camera-analysis GUI app for laser labs
    • FAIR data workflow
    • Sardana enhancement for high intensity laser labs
    • Web overview for experiments
    Go to contribution page
  4. Michal Piekarski (SOLARIS), Urszula Jachymczyk (NSRC SOLARIS, Jagiellonian University)
    08/06/2026, 11:15
    Facility Status Reports
    Talk

    This status report covers a comprehensive status update on the current state of the Controls Group of the SOLARIS synchrotron. The report reviews recent upgrades and maintenance activities aimed at improving system stability, automation, and user accessibility. Particular attention is given to systems migration and refactored rpm packaging. Finally, the report outlines ongoing new...

    Go to contribution page
  5. Mr Jitendra Kodilkar (National Centre For Radio Astrophysics, Tata Institute of Fundamental Research, Tata Institute of Fundamental Research)
    08/06/2026, 11:35
    Facility Status Reports
    Remote Talk

    Upgradation and Modernization of the Tango based GMRT Control (TGC) System.

    Jitendra Kodilkar 1 , Raj Uprade 1, Bhavesh Kunbi 1, Mayur Bhagade 2, Isha Gothwad 3, Anil Raut 1, Ishwara Chandra 1, Yogesh Wadadekar 1, Yashwant Gupta 1

    1 National Centre for Radio Astrophysics, Pune University Campus, Pune, India.
    2 *Government College of Engineering & Research, Avasari Khurd, Pune,...

    Go to contribution page
  6. Hannes Feldt
    08/06/2026, 11:55
    Facility Status Reports
    Short Talk

    A status update on the usage of TANGO Controls in LOFAR 2.0 Station Control and beyond.

    Go to contribution page
  7. Théo Rozier (ESRF)
    08/06/2026, 12:10
    Facility Status Reports
    Short Talk

    Status report of ESRF, regarding usages of Tango here, what challenges are we facing with Tango, how we manage it, its development and deployment workflows, and more to be defined.

    Go to contribution page
  8. Stéphane Marchand (CNRS/LULI)
    08/06/2026, 12:25
    Facility Status Reports
    Short Talk

    This presentation provides a quick update on the status of the LULI facilities. The LULI (Laboratoire pour l’Utilisation des lasers intenses) is located 20 km SW from Paris and operates 3 different facilities: LULI2000, Apollon and Hera. The facilities provide high energy or high power laser beams which interact with gas or solid targets. We will refresh the previous status and the current...

    Go to contribution page
  9. Zbigniew Reszela (ALBA Synchrotron)
    08/06/2026, 12:30
    Facility Status Reports
    Talk

    This presentation provides an update on the status of the ALBA Controls System and the activities of the Controls Section. It will review recent developments, operational status, ongoing improvements, and current priorities in supporting ALBA accelerator and beamline operations. The talk will also outline key challenges and future directions, including initial perspectives and preparation...

    Go to contribution page
Building timetable...